Hohm Tech WORK 18650
-
New SudburyUnavailable for pickup
765 Barrydowne Road
Unit 102
Greater Sudbury ON P3A 3T6
Canada -
Temiskaming ShoresUnavailable for pickup
42 Armstrong St N
New Liskeard ON P0J 1P0
Canada -
North BayAvailable for pickup Usually ready in 1 hour
271 Main St W
North Bay ON P1B 2T8
Canada -
North Bay NorthernUnavailable for pickup
555 Mckeown Ave
Unit 2
North Bay ON P1B 0C8
Canada -
Sault Ste MarieUnavailable for pickup
59 Great Northern Road
Sault Ste. Marie ON P6B 4Y7
Canada -
Sault Ste Marie EastUnavailable for pickup
625 Trunk Road
Unit 4
Sault Ste. Marie ON P6A 3T1
Canada -
Sturgeon FallsUnavailable for pickup
169 Front Street
Sturgeon Falls ON P2B 2H9
Canada -
South EndUnavailable for pickup
2152 Long Lake rd
Sudbury ON P3E 5H1
Canada -
TimminsUnavailable for pickup
698 Riverside Drive
Timmins ON P4N 3V9
Canada -
Timmins CentralUnavailable for pickup
205 Third Ave
Timmins ON P4N 1C9
Canada
Say hello to the successor of the Hohm Work 18650…we proudly introduce you to the Hohm Work2. Phenomenal sustained amperage and voltage delivery under heavy load in a 18650 (18mm x 65mm) cell. These are rated by Indonesia Chemistry at 2576mAh capacity, with a CDR of 24.7A and a pulse/peak rating of 41.3A*6. All ratings are subject to meet and/or exceed strict limitation policies set forth for DLr*1, TID*2, PVDL*3, CLR*4 mΩR*5, and Temperature (°C). Hohm Work2 is built with CoMn chemistry concentration, with manganese inert compounds replaced with proprietary levels of cobalt oxide and raw graphite to achieve unprecedented capabilities.
Every Hohm Tech cell model has been tested and certified by the rightful authorities/laboratories and accredited entities to achieve certification of MSDS, CE, ROHS, UN38.3, Specifications, Air/Sea Transport, and PLI. We do not cut corners. We deliver what we promise… chart topping performance, capacity, consistency, and safety.
These cells are built specifically for intense & power-hungry devices that require consistent amperage delivery to operate as intended. Not only was power & capacity a priority, but safety measures were at the forefront of it all.